JEE Main 2024 (30 Jan Shift 2) Physics: Alternating Current

Numerical value Memory based Alternating Current

A power transmission line feeds input power at 2.3 kV to a step down transformer with its primary winding having 3000 turns. The output power is delivered at 230 V by the transformer. The current in the primary of the transformer is 5 A and its efficiency is 90%. The winding of transformer is made of copper. The output current of transformer is ______ A.

Numerical-value question: the answer is a number.

Show answer

The answer is 45.

Key from source paper

See the step-by-step solution in EdLoop

The worked solution is in the EdLoop app, free on Android, with every other Alternating Current question from 2002 to 2026.

Physics Alternating Current question from JEE Main 2024 (30 Jan Shift 2) (JEE Main exam). Memory-based papers are reconstructed from candidates' memory by coaching institutes.